ITS Blog

Network Upgrade

Leave a comment (login required)

Updated: Network Maintenance in Main Building 7/2/2021

Update 7/2/2021 12:30PM: The network upgrade in main is completed. On Friday July 2, from 8AM until approximately 2PM, ITS will be working to upgrade network equipment in Main. Both the wired and wireless network in Main will be unavailable during the duration of the upgrade. If you have trouble printing after the upgrade please try turning your printer off and back on again.

Full article

Leave a comment (login required)

Network upgrades 7/9 and 7/14/2021

On Friday July 9, 2021, and Wednesday July 14, 2021, ITS will be working to upgrade our Network Access Control System. There will be short periods of time during both of these days where users will be unable to connect to the LCWireless and LCSecure wireless networks. If you’re already connected to LCWireless or LCSecure or using a wired connection, you should have uninterrupted network access.

Full article

Wireless

Leave a comment (login required)

Network Access Control system 3/5/2021: Updated

Update 3/5/2021 7:30AM -- The upgrade is complete and all service should be functional again.

On Friday March 5, 2021 starting at 6AM, ITS will be upgrading our Network Access Control system. During short portions of the upgrade process computers may be unable to make new connections to the LCWireless and LCSecure wireless networks.. The upgrade process is expected to be completed before 8:00AM. For updates on this upgrade see http://www.luther.edu/its/blog/

Full article